НЦ ОМЗ :: NewsSpace News :: Версия для печати

Major Operations and Experiments in the International Space Station (June 1-7, 2009)

June 1, Monday
ISS attitude control with USOS CMG assistance
Bio-experiment: Biorisk (exposure of the sets with passive samples), Rasteniya-2 (Plants) (evaluation of the effectiveness provided by the humidification and aeration system for the roots of the plants in microgravity)
Bio-technological experiments: Biotrek (study of space radiation heavy particle flows influence on genetic properties of producing cells in biologically active substances), Lactolen (study of the space environment effects on growing, genetic and physiological parameters of the lactolen producent strain)
Life-science experiment: Matreshka-R (study of radiation environment dynamics in the station and improvement of space dosimetry equipment),
Technical experiment: BTN-Neutron (registration of high-energy neutron flows), Sreda (Environment) (integrated study of the ISS parameters as industrial environment for different research)
Geophysical experiment: Vsplesk (Splash)(monitoring of the seismic effects in near-Earth space), Impulse (ionosphere sounding by pulsed plasma sources), Uragan (Hurricane) (experimental validation of space and ground system designed for natural and human-caused emergency prediction and focused on mitigation of their effects, as well as development of classification and decoding criteria)
Contract experiment: EXPOSE-R (study of the exobiological processes in the outer space)
Scheduled activities:
ECLSS (Environment Control and Life Support System) maintenance operations

June 2, Tuesday

ISS attitude control with USOS CMG assistance
Bio-experiment: Biorisk, Rasteniya-2
Life-science experiment: Matreshka-R
Bio-technological experiments: Lactolen
Technical experiment: BTN-Neutron
Geophysical experiments: Vsplesk, Impulse, Uragan
Contract experiment: EXPOSE-R
Private medical conference
Measurement of the body mass and shank size
Scheduled activities:
ECLSS maintenance operations


June 3, Wednesday

ISS attitude control with USOS CMG assistance
Bio-experiment: Rasteniya-2
Life-science experiment: Matreshka-R, Sonocard (validation of the medical system by using contactless monitoring of the crew physiological parameters during sleeping time), Pilot-M (validation of the methods and means for the cosmonauts to maintain their skills in vehicle control with the help of Neurolab facility)
Bio-technological experiments: Biotrek, Lactolen
Technical experiments: BTN-Neutron, Izgib (Curve) (registration of the levels in micro-accelerations which are provided by the equipment functioning on-board), Identification (refining ISS math model parameters)
Geophysical experiments: Vsplesk , Impulse
Contract experiment: EXPOSE-R
Scheduled activities:
Pre-EVA preparations, training with the space suits on
ECLSS maintenance operations


June 4, Thursday

ISS attitude control with USOS CMG assistance
Bio-experiment: Biorisk, Rastenyia-2
Bio-technological experiment: Lactolen
Technical experiments: BTN-Neutron
Life-science experiment: Matreshka-R, Sonocard, Typology (study of the typological features in the operator`s activities of the crew during long-term missions)
Geophysical experiments: Vsplesk, Impulse
Contract experiment: EXPOSE-R
Medical test: urine biochemical analysis
Scheduled activities:
Pre-EVA activities, refining the timeline
Preparation of the Pille sensors for EVA
ECLSS maintenance operations

June 5, Friday

ISS attitude control with USOS CMG assistance
Bio-experiment: Biorisk
Bio-technological experiments: Lactolen
Technical experiments: BTN-Neutron
Life-science experiment: Matreshka-R
Geophysical experiments: Vsplesk, Impulse
Contract experiment: EXPOSE-R
Medical test: urine biochemical analysis
Scheduled activities:
ISS attitude control with RS thruster assistance for the period of pre-EVA dressing-up and air-locking
EVA
ECLSS maintenance operations

June 6, Saturday

ISS attitude control with USOS CMG assistance
Bio-experiments: Biorisk, Rastenyia-2
Life-science experiments: Matreshka-R
Technical experiments: BTN-Neutron
Bio-technological experiments: Lactolen
Geophysical experiments: Vsplesk, Impulse
Contract experiment: EXPOSE-R
Medical test: measurement of the body mass
Scheduled activities
ECLSS maintenance operations
Post-EVA reading Pille dosimeter data
Crew rest

June 7, Sunday

ISS attitude control with USOS CMG assistance
Bio-experiments: Biorisk, Rastenyia-2
Life-science experiment Matreshka-R
Bio-technological experiments: Lactolen
Technical experiments: BTN-Neutron
Geophysical experiment: Vsplesk, Impulse
Contract experiment: EXPOSE-R
Scheduled activities
Weekly ISS cleaning
ECLSS maintenance operations
Crew rest

Nomenclature and sequence of the operations to be performed may vary depending on real circumstances


URL документа: http://www.ntsomz.ru/news/news_cosmos/news030609
Copyright © НЦ ОМЗ