Research Center
for Earth Operative Monitoring

 

RUS | ENG

Подрубрики:
News
Space News
Ohter News
Newsletter

Soyuz TMA-17 Prelaunch Processing at Baikonur

Soyuz system autonomous tests are completed. Russian specilists began integrated testing..

LCROSS probe found water on the Moon.

.

«Progress» with the new ISS module docked to the ISS

Ship «Progress», bearing Russia’s new ISS module «Poisk», successfully docked with the station on November 12 in 18 hours 41 minutes Moscow time..

The fourth module of Russia’s segment of the ISS went into orbit.

From the Baikonur launched «Soyuz-U» with the Small Research Module-2 (MIM-2)" Poisk " on board ..

Progress M-MRM2: Autonomous Mission

Progress-M will deliver mini-research module Poisk to the station..

DM-SLB Prop Filling Operation is Prepared at Baikonur

.

Fragment of space garbage damaged the astronauts sleep

In the night of 6 to 7 November 2009 on the ISS was launched anxiety in connection with a possible collision with space debris station..

Soyuz-U/Progress M-MRM2 Erected on the Launch Pad

Prelaunch operations with Soyuz-U/Progress M-MRM2 continue at Baikonur..

Orbital hotel has begun taking pre-orders.

Company Galactic Suite Ltd. started to register all who wish to spend his vacation on orbit..

Flight tests of the spacecraft Meteor-M »№ 1.

Shooting the Earth surface form «Meteor-M» №1 spacecraft by equipment KMSS are in progress.

The 3rd of November, 2009.. / November 3, 2009 /

All-Russia scientific and scientific-technical meetings, conferences and seminars.

One of the three parachutes of new NASA rocket has not worked.

One of the three parachutes of start engine of NASA «Ares-IX», a test launch of which took place the day before, did not work, said Oct. 30 Florida Today..

Two European satellites has launched from Plesetsk cosmodrome

Early morning of November 2 from the Plesetsk cosmodrome in the Arkhangelsk region has successfully launched two European scientific satellites..

Progress-M-MRM2: Prop Filling Completed

Propulsion system of the Poisk (MRM-2) module was loaded with propellant and pressurized gases yesterday at the Baikonur`s filling station..

Astronomers have calculated the probability of future collisions with space garbage

Astronomers from the United Kingdom calculated the probability of collisions of satellites and space garbage in low Earth orbit.

The second attempt of launching of «Ares-IX» was successful

New rocket NASA «Ares-IX» was succesfuly launched from the spaceport at Cape Canaveral at the second attempt..

CORONAS-PHOTON Observes Spike of Solar Activity

Spike of solar activity was registered by TESIS observatory installed on Russian satellite CORONAS-PHOTON within previous two days. This is caused by two new active areas which were numbered 1028 and 1029 in NOAA (National Oceanic and Atmospheric Administration, USA) catalogue..

The start of a new NASA missile has postponed

Start of a Ares-IX has postponed until Oct. 28 due to bad weather conditions, the NASA website reported . Time alleged launch has not yet scheduled..

The future of the U.S. space program entrust to Obama.

The list of development priorities of the American space program, laid out in the open access. Planning Committee manned flights in the U.S. government published the final version of the report on its work, during which members of the committee evaluated the program. Based on the report, U.S. President Barack Obama will make a final resolution on the future of American space exploration..

About the flight tests of the Meteor-M satellite

We got the first images from multi-channel scanning device of low resolution MSU-MR.

страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 | 125 | 126 | 127 | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 146 | 147 | 148 | 149 | 150 | 151 | 152 | 153 | 154 | 155 | 156 | 157 | 158 | 159 | 160 | 161 | 162 | 163 | 164 | 165 | 166 | 167 | 168 | 169 | 170 | 171 | 172 | 173 | 174 | 175 | 176 | 177 | 178 | 179 | 180 | 181 | 182 | 183 | 184 | 185 | 186 | 187 | 188 | 189 | 190 | 191 | 192 | 193 | 194 | 195 | 196 | 197 | 198 | 199 | 200 | 201 | 202 | 203 | 204 | 205 | 206 | 207 | 208 | 209 | 210 | 211 | 212 | 213 | 214 | 215 | 216 | 217 | 218 | 219 | 220 | 221 | 222 | 223 | 224 | 225 | 226 | 227 | 228 | 229 | 230 | 231 | 232 | 233 | 234 | 235 | 236 | 237 | 238 | 239 | 240 | 241 | 242 | 243 | 244 | 245 | 246 | 247 | 248 | 249 | 250 | 251 | 252 | 253 | 254 | 255 | 256 | 257 | 258 | 259 | 260 | 261 | 262 | 263 | 264 | 265 | 266 | 267 | 268 | 269 | 270 | 271   

© Official Site of Research Center for Earth Operative Monitoring (NTS OMZ). Where any materials on this site are republished or copied, the source of the material must be identified.

127490, Moscow, Decabristov st., b.51, h.25
Tel.: +7 (495) 925-0419, +7 (495) 229-4389, Fax: +7 (495) 509-1200
E-mail: ntsomz@ntsomz.ru

 

Яндекс цитирования Rambler's Top100 Система Orphus