Research Center
for Earth Operative Monitoring

 

RUS | ENG

Подрубрики:
News
Space News
Ohter News
Newsletter

At the cosmodrome the block from three SA «Glonass-M» join Baikonur with upper block DM-2 / September 16, 2009 /

At the cosmodrome Baikonur works on preparation for start of a rocket of space appointment «Proton-M» with upper block DM-2 of three navigating companions «Glonass-M» proceed..

Start SA «Meteor-M» is transferred for reserve date / September 16, 2009 /

The cosmodrome Baikonur: start of a rocket of space appointment of «Sojuz-2» with a space apparatus «Meteor-M» and small SA is transferred.

The Carrier rocket «Proton» with a space apparatus «Nimik-5» is established on a starting complex / September 15, 2009 /

On 95th platform of the cosmodrome Baikonur today – the first starting day under the schedule of preparation for start of a carrier rocket «Proton-M» with a space apparatus «Nimik-5»..

The shuttle «Diskaveri» has made a successful landing / September 14, 2009 /

On Friday at 20:53 on time of east coast (4:53 Saturdays Moscow time) the shuttle «Diskaveri» has made landing to air base of the Air Forces of the USA «Edwards».

«Meteor-M» corresponds to the American and European analogues and even surpasses them in an equipment set / September 14, 2009 /

The representative of the customer has told about great value for Russia of a conclusion to an orbit of new meteorological satellite «Meteor-M» the stats-secretary – a deputy head of Roskosmos Valery Nikolaevich Djadjuchenko.

At the cosmodrome Baikonur assemblage of a space head part for start-up «Proton-M» / has begun «Glonass-M» / September 11, 2009 /

At the cosmodrome Baikonur works on preparation for start by a rocket of space appointment «Proton-M» with upper block DM-2 of three navigating companions «Glonass-M» proceed..

NASA has published «Hubble’s» first pictures after repair / September 11, 2009 /

The American space agency has published the first photos made a telescope «Hubble» after repair..

Returning of a shuttle «Diskaveri» to the Earth is postponed because of bad weather. / September 11, 2009 /

Returning a shuttle «Diskaveri» to the Earth, planned for the night with 10 for September, 11th.

Soyuz TMA-16 Prelaunch Tests Continue Successfully / September 10, 2009 /

Baikonur space port: preparations for the next crew launch go on..

NASA will launch a telescope to study black holes in 2011. / September 10, 2009 /

The U.S. space agency has resumed work on the creation of the orbital X-ray telescope NuSTAR (Nuclear Spectroscopic Telescope Array)..

Space Shuttle Discovery undocked from the ISS / September 9, 2009 /

Shuttle «Discovery» undocked from the International Space Station and coming back to the Earth.

Soyuz TMA-16 Prelaunch Operations Continue / September 8, 2009 /

Prelaunch processing of the Soyuz TMA-16 crew vehicle continue at Baikonur..

NASA engineers will protect the Mars Reconnaissance Orbiter of repeated failures. / September 8, 2009 /

NASA engineers have started to remotely repair apparatus Mars Reconnaissance Orbiter (MRO), which currently revolves around the Red Planet, said in a press release NASA. In particular, a series of activities aimed at preventing the emergence of similar problems in the future..

Indian newspapers have explained the reasons of the lunar probe failure / September 8, 2009 /

Several Indian media have published material, which explains the reason for failure of the first lunar probe «Chandrayaan-1», launched by India on Oct. 22, 2008. In editions of The Times of India and on the portal India.com failure of the probe due to overheating, which occurred due to an incorrect calculation of the specialists temperature on the lunar orbit..

Astronauts could not connect the cable to Node 3 / September 7, 2009 /

During the third and final spacewalk shuttle mission in the «Discovery» astronauts to the ISS fulfilled a large part of the planned works, but were not able to connect one of the cables to the module Node 3, which will be installed at the station in 2010. This was reported on Sunday at NASA..

Indian lunar probe photographed the landing site of Apollo 15 / September 4, 2009 /

Indian lunar probe «Chandrayaan-1» photographed the landing site «Apollo 15». Pictures are shown and described in an article written by staff of the Indian space agency (ISRO). Brief Photos of an Indian newspaper The Times of India..

Discovery astronauts was out in open space the second time. / September 4, 2009 /

Shuttle Astronauts «Discovery» at 18:12 pm on September 3, Eastern time (02:12 Moscow, September 4) started the second spacewalk. This was reported on the official site of NASA..

In Korolev RSC «Energy» tests of specialized cargo spacecraft module «Progress M-MIM2» completed / September 3, 2009 /

Korolev Rocket and Space Corporation «Energy» completed tests in a pressure chamber of specialized cargo spacecraft module «Progress M-MIM2». Аt the present time continuing works on its preparation for delivering to Baikonur..

Appearance of PMTS. Illustration from RSC Energia. Testing Russia’s new spacecraft is scheduled for 2015 / September 2, 2009 /

The first tests of the new Russia’s unmanned spacecraft will held in 2015. Tests of the ship with the pilots on board are scheduled for 2018. Such figures led Deputy General Designer of RSC «Energia» chief designer of manned systems Nikolai Bryukhanov in an article in the weekly «Industry»..

In Russia preparations for the third phase of the experiment «Mars-500" are in progress / September 2, 2009 /

Specially selected, volunteers will hold almost half the year in conditions as close as possible to those that will be during a real expedition to Mars. To do this, prepare special spacesuits..

страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 | 125 | 126 | 127 | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 146 | 147 | 148 | 149 | 150 | 151 | 152 | 153 | 154 | 155 | 156 | 157 | 158 | 159 | 160 | 161 | 162 | 163 | 164 | 165 | 166 | 167 | 168 | 169 | 170 | 171 | 172 | 173 | 174 | 175 | 176 | 177 | 178 | 179 | 180 | 181 | 182 | 183 | 184 | 185 | 186 | 187 | 188 | 189 | 190 | 191 | 192 | 193 | 194 | 195 | 196 | 197 | 198 | 199 | 200 | 201 | 202 | 203 | 204 | 205 | 206 | 207 | 208 | 209 | 210 | 211 | 212 | 213 | 214 | 215 | 216 | 217 | 218 | 219 | 220 | 221 | 222 | 223 | 224 | 225 | 226 | 227 | 228 | 229 | 230 | 231 | 232 | 233 | 234 | 235 | 236 | 237 | 238 | 239 | 240 | 241 | 242 | 243 | 244 | 245 | 246 | 247 | 248 | 249 | 250 | 251 | 252 | 253 | 254 | 255 | 256 | 257 | 258 | 259 | 260 | 261 | 262 | 263 | 264 | 265   

© Official Site of Research Center for Earth Operative Monitoring (NTS OMZ). Where any materials on this site are republished or copied, the source of the material must be identified.

127490, Moscow, Decabristov st., b.51, h.25
Tel.: +7 (495) 925-0419, +7 (495) 229-4389, Fax: +7 (499) 204-7745
E-mail: ntsomz@ntsomz.ru

 

Яндекс цитирования Rambler's Top100 Система Orphus