Research Center
for Earth Operative Monitoring

 

RUS | ENG

Подрубрики:
News
Space News
Ohter News
Newsletter

The space apparatus «Nimik-5» is taken on management of the customer

Today, at 8:34 Moscow time the telecommunication space apparatus «Nimik-5» was separated from upper block «Breeze-M» and has been accepted on management of the foreign customer..

The weather satellite «Meteor-М» is successfully introduced to a target orbit

Start CR of «Sojuz-2» from the cosmodrome Baikonur on which board there was a weather satellite and 6 small SA, has taken place on September, 17th..

Russia after a five years’ break will have a weather satellite

From the cosmodrome Baikonur at 19:55 Moscow time was started by a carrier rocket «Sojuz-2» with the Russian meteorological companion «Meteor-M».

Start of the space meteoscout is postponed exactly for days for technical reasons. A situation for space departments of the world typical, by a principle: seven times measure…

Start of a rocket «Sojuz» from the cosmodrome Baikonur is postponed for technical reasons for today..

At the cosmodrome the block from three SA «Glonass-M» join Baikonur with upper block DM-2

At the cosmodrome Baikonur works on preparation for start of a rocket of space appointment «Proton-M» with upper block DM-2 of three navigating companions «Glonass-M» proceed..

Start SA «Meteor-M» is transferred for reserve date

The cosmodrome Baikonur: start of a rocket of space appointment of «Sojuz-2» with a space apparatus «Meteor-M» and small SA is transferred.

The Carrier rocket «Proton» with a space apparatus «Nimik-5» is established on a starting complex

On 95th platform of the cosmodrome Baikonur today – the first starting day under the schedule of preparation for start of a carrier rocket «Proton-M» with a space apparatus «Nimik-5»..

The shuttle «Diskaveri» has made a successful landing

On Friday at 20:53 on time of east coast (4:53 Saturdays Moscow time) the shuttle «Diskaveri» has made landing to air base of the Air Forces of the USA «Edwards».

«Meteor-M» corresponds to the American and European analogues and even surpasses them in an equipment set

The representative of the customer has told about great value for Russia of a conclusion to an orbit of new meteorological satellite «Meteor-M» the stats-secretary – a deputy head of Roskosmos Valery Nikolaevich Djadjuchenko.

At the cosmodrome Baikonur assemblage of a space head part for start-up «Proton-M» / has begun «Glonass-M»

At the cosmodrome Baikonur works on preparation for start by a rocket of space appointment «Proton-M» with upper block DM-2 of three navigating companions «Glonass-M» proceed..

NASA has published «Hubble’s» first pictures after repair

The American space agency has published the first photos made a telescope «Hubble» after repair..

Returning of a shuttle «Diskaveri» to the Earth is postponed because of bad weather.

Returning a shuttle «Diskaveri» to the Earth, planned for the night with 10 for September, 11th.

Soyuz TMA-16 Prelaunch Tests Continue Successfully

Baikonur space port: preparations for the next crew launch go on..

NASA will launch a telescope to study black holes in 2011.

The U.S. space agency has resumed work on the creation of the orbital X-ray telescope NuSTAR (Nuclear Spectroscopic Telescope Array)..

Space Shuttle Discovery undocked from the ISS

Shuttle «Discovery» undocked from the International Space Station and coming back to the Earth.

Soyuz TMA-16 Prelaunch Operations Continue

Prelaunch processing of the Soyuz TMA-16 crew vehicle continue at Baikonur..

NASA engineers will protect the Mars Reconnaissance Orbiter of repeated failures.

NASA engineers have started to remotely repair apparatus Mars Reconnaissance Orbiter (MRO), which currently revolves around the Red Planet, said in a press release NASA. In particular, a series of activities aimed at preventing the emergence of similar problems in the future..

Indian newspapers have explained the reasons of the lunar probe failure

Several Indian media have published material, which explains the reason for failure of the first lunar probe «Chandrayaan-1», launched by India on Oct. 22, 2008. In editions of The Times of India and on the portal India.com failure of the probe due to overheating, which occurred due to an incorrect calculation of the specialists temperature on the lunar orbit..

Astronauts could not connect the cable to Node 3

During the third and final spacewalk shuttle mission in the «Discovery» astronauts to the ISS fulfilled a large part of the planned works, but were not able to connect one of the cables to the module Node 3, which will be installed at the station in 2010. This was reported on Sunday at NASA..

Indian lunar probe photographed the landing site of Apollo 15

Indian lunar probe «Chandrayaan-1» photographed the landing site «Apollo 15». Pictures are shown and described in an article written by staff of the Indian space agency (ISRO). Brief Photos of an Indian newspaper The Times of India..

страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 | 125 | 126 | 127 | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 146 | 147 | 148 | 149 | 150 | 151 | 152 | 153 | 154 | 155 | 156 | 157 | 158 | 159 | 160 | 161 | 162 | 163 | 164 | 165 | 166 | 167 | 168 | 169 | 170 | 171 | 172 | 173 | 174 | 175 | 176 | 177 | 178 | 179 | 180 | 181 | 182 | 183 | 184 | 185 | 186 | 187 | 188 | 189 | 190 | 191 | 192 | 193 | 194 | 195 | 196 | 197 | 198 | 199 | 200 | 201 | 202 | 203 | 204 | 205 | 206 | 207 | 208 | 209 | 210 | 211 | 212 | 213 | 214 | 215 | 216 | 217 | 218 | 219 | 220 | 221 | 222 | 223 | 224 | 225 | 226 | 227 | 228 | 229 | 230 | 231 | 232 | 233 | 234 | 235 | 236 | 237 | 238 | 239 | 240 | 241 | 242 | 243 | 244 | 245 | 246 | 247 | 248 | 249 | 250 | 251 | 252 | 253 | 254 | 255 | 256 | 257 | 258 | 259 | 260 | 261 | 262 | 263 | 264 | 265 | 266 | 267 | 268 | 269 | 270 | 271   

© Official Site of Research Center for Earth Operative Monitoring (NTS OMZ). Where any materials on this site are republished or copied, the source of the material must be identified.

127490, Moscow, Decabristov st., b.51, h.25
Tel.: +7 (495) 925-0419, +7 (495) 229-4389, Fax: +7 (495) 509-1200
E-mail: ntsomz@ntsomz.ru

 

Яндекс цитирования Rambler's Top100 Система Orphus